South East Rivers Trust

Address: 
24 Denmark Road
Carshalton
London
SM5 2JG
United Kingdom

Partnership actions tagged by South East Rivers Trust

Displaying 1 - 30 of 34
To restore the river to a more naturally functioning watercourse
Enhance river hydromorphology and biodiversity
Sub catchment Status
habitat restoration (in-channel, riparian, associated floodplain meadows) to help achieve Good Ecological Status in the River Darent Darent Proposed View
Investigate reasons for and options for removal of concrete amourment of channel below the M26 bridge Darent Proposed
Much of the Upper Darent is heavily shaded, reducing macrophyte (in-channel weed) growth, which provides habitat for fish and invertebrates. Darent Proposed View
Restore habitat at Harpers Weir Teise Completed View
Habitat restoration on the River Bewl Teise Completed View
Sub catchment Status
Raise awareness of activities that impact water quality Darent Proposed
Habitat restoration to help achieve Good Ecological Potential in the Hammer Stream Beult Completed View
Investigate improvement to fish passage and habitat enhancements through the Upper Darent Darent Proposed
Improve fish passage at Harpers Weir by removal of redundant structure Teise Completed View
Work with farming community to tackle diffuse pollution issues Darent Proposed
To improve water quality
Tackling Diffuse Pollution
Sub catchment Status
Deliver silt trap and wetland treatment train in Dobb's Field to address sediment and nutrient loading of pond from upstream catchment, following South East Rivers Trust investigation and outline design report, to address the 'un-favourable' - no change state of this SSSI. Eden Active View
Improve awareness and understanding of water quality
Sub catchment Status
Promote best practice farming approaches Middle Medway Proposed View
To develop sustainable water management within the catchment
Reduce the impact of flooding
Sub catchment Status
Investigate SuDS opportunities at Marlborough Park, Sidcup Cray and Shuttle Proposed
Identify Natural Flood Management opportunities within the Darent catchment Darent Proposed
Investigate NFM opportunities in the Eden Eden Planned View
To have communities that enjoy, engage with and protect the river
Ensure the river is well-valued and understood by the local community
Sub catchment Status
Offer events and provide educational content on rivers to local people to increase their engagement with their local river and improve their awareness of the most important issues facing water management and the River Medway: www.formedway.org Upper Medway Active View
Develop a citizen science project with the local community to provide intelligence on river issues. Darent Proposed
Ensure stakeholders are aware and can contribute to the catchment improvement process
Sub catchment Status
Deliver annual surveying events with partner organisations Cray and Shuttle Active
Increase enjoyment and use of the river
Sub catchment Status
Recruit River Guardians/River Search volunteers to report/help clear litter and debris from the River Eden. Eden Planned View
The river should support a mosaic of habitats with high biodiversity value
Eradicate and control Invasive non-native flora and fauna
Sub catchment Status
Deliver a coordinated approach to Invasive Non-Native Species control Darent Proposed
Improve condition and biodiversity of riparian areas
Sub catchment Status
Deliver habitat enhancement above Sundridge Water Works Weir Darent Proposed
To have an appropriate self-sustaining fish population
Address fish passage so fish can access appropriate habitats
Sub catchment Status
Identify suitable options to address fish passage through Dartford Darent Proposed
Creation of fish passage at Dairyhouse Weir Teise Completed View
Create a bypass channel at Sundridge weir for fish passage Darent Completed
Create fish passage at Gatehouse weir Teise Completed View
Create fish passage at New Lodge Weir Teise Completed View
Deliver removal of Tanners Weir to address fish passage issues Darent Proposed
Understand the current and potential fish population
Sub catchment Status
Investigate fish populations within the River Bourne Middle Medway Proposed View
Deliver fish surveys to fill data gaps Proposed
Review the FCS2 classification and assess its appropriateness. Proposed

Pages